Delays & Problems
When the schedule slips, the right update names the impact, the next step, and the decision required. No apology spiral. No blame.
15 scripts. Every video comes with its full script and a printable practice sheet. Free, no email needed.
1-minute videoTelling a Client About a Delay Without Saying SorryQuick update on the site survey deliverables. The soil analysis report came in four days late from the lab, which shifted our grading design by the same amount. Revised delivery for grading drawings is now April 22nd instead of April 18th.VideoScriptPractice sheet
1-minute videoReporting a Delay to a Client With a Recovery PlanUpdate on the curtain wall design. We found a coordination conflict between the HVAC routing and the facade support structure. This will delay the curtain wall drawings by one week.VideoScriptPractice sheet
14-minute lessonHow to Tell a Client About a Delay Without Blaming AnyoneThis video gives you the exact structure, the exact words, and the exact tone so you deliver that message in client-ready English, professionally with zero blame, and a clear path forward. By the end of this video, you will have a structure you can use today in your next client email or call.VideoScriptPractice sheet
1-minute videoWaiting on Client Feedback? Send This to Move It AlongQuick update on the mechanical design package. We submitted the HVAC drawings for your review on April 1st. To keep the project on schedule, we need your feedback by April 8th.VideoScriptPractice sheet
1-minute videoYou Just Found Out the Project Slipped: Send This Before They AskThe permit package is due at the agency on Thursday, and your client should hear this from you first. Send this message. On today's coordination call, our structural engineering firm told us the structural submittal will be three days late, due to time allocated to an additional independent check of the calculations.VideoScriptPractice sheet
1-minute videoBreak the News of a Slipped Timeline Three Ways: Friendly, Neutral, or FirmFriendly, neutral, or firm. One update to your client, three ways to send it.VideoScriptPractice sheet
1-minute videoA Subcontractor Caused the Delay: What to Tell Your ClientTwo versions.VideoScriptPractice sheet
10-minute lessonProject Management English: How to Tell Clients About Schedule SlipsYour client needs to hear this from you first. Told early, a delay is an update. If the client finds out after the permit date slips, the same news sounds like an excuse. You'll have one short email that tells the client early, gives your recommendation, and asks for their answer by a date.VideoScriptPractice sheet
1-minute videoDelays or Scope: Which Message Would You Send?First, the late submittal.VideoScriptPractice sheet
1-minute videoYour Supplier Just Moved the Delivery Date: Send This Before They AskThe lobby floor tile was due next week, and your client should hear this from you first. Send this message. Our supplier told us this morning that the lobby floor tile will arrive nine days later than planned, because the factory needs more time to finish the order.VideoScriptPractice sheet
1-minute videoWeather Delay: Do Not Wait for Certainty to Tell the ClientAvoid sending this. Thank you for your patience. The weather may delay the pour.VideoScriptPractice sheet
1-minute videoClient Asks "Can You Commit to the New Date?" Say ThisAvoid saying this. Thank you for your patience. Yes, the pour will be on the new date.VideoScriptPractice sheet
1-minute videoTell a Client About a Delay Early: It Becomes an UpdateYou'll have one short email that tells the client early, gives your recommendation, and asks for their answer by a date. You recommend and the client weighs in.VideoScriptPractice sheet
1-minute videoTelling a Client About a Delay? Do Not Make These 3 MistakesIf you keep repeating it, the client starts wondering whether you actually have a plan, or you are just hoping the situation fixes itself. Do not blame someone else by name. Even if the vendor caused the delay, you do not say they failed, or it is their fault.VideoScriptPractice sheet
11-minute lessonDon't Wait Until Pour Day: Tell the Client About Weather DelaysYou're managing the footing pour for a new structure. Pour day is a week away. Heavy rain is forecast for pour day, and the concrete supplier can't pour in heavy rain, so the pour moves four days. The steel crew starts right after the concrete cures, so the delay moves their start too. You've checked the earliest dry pour window with the supplier, and you've confirmed the formwork and steel inspections remain on. You've also checked the float. What you do next decides whether the client hears it from you, or finds out on site.VideoScriptPractice sheet
Free script pack
Get the Free Delays Script Pack
The next conversation will not sound like this one. The free Delays pack gives you five more scripts for when the schedule slips and the client needs to hear it from you, each in friendly, neutral, and firm versions, so the right words are ready before you need them.